Fine Feather Skimming Plaster
Pack Size: 20kg

Fine Feather Skimming Plaster

Package: 20kg

Fine Feather Skimming Plaster

MULTI FEATHER SKIM is a fine finishing and feathering plaster for use on dry walls, ceiling boards, concrete soffits, and pre-cast blocks. Skim-on application that leaves a smooth, plastered surface.

Typical Applications

MULTI FEATHER SKIM provides a hard-wearing non-dusting plastered surface over the following interior substrates:

  • Dry walls
  • Masonry
  • Ceiling boards
  • Soffits
  • Concrete blocks

Download our Spec Sheets below:

Description

MULTI FEATHER SKIM is a fine finishing and feathering plaster for use on dry walls, ceiling boards, concrete soffits, and pre-cast blocks. Skim-on application that leaves a smooth, plastered surface.

Typical Applications

MULTI FEATHER SKIM provides a hard-wearing non-dusting plastered surface over the following interior substrates:

  • Dry walls
  • Masonry
  • Ceiling boards
  • Soffits
  • Concrete blocks

Advantages

  • Dust free surface
  • Smooth application
  • Fast setting
  • Light weight
  • Low VOC
  • No need for bonding liquids

 

Typical Properties

Colour on setting

Off Grey

Drying Time

20 minutes

Time to sanding

60 minutes

Application Thickness

6mm to feather

Initial Setting Time

10 min

Working Time

10-15 min

Compressive Strength

15 MPa

Water Requirement

4.5Lts per 20Kg

Yield on 20Kg

15 Litres

Watch Points

  • Do not re-constitute the mix after initial setting has occurred.
  • Colour of the screed surface on setting may not uniform in appearance
  • Do not apply over damp surfaces or where moisture is a concern.

Directions for Use

Surface Preparation:

Surfaces are to be clean, sound and free of dust and deleterious substances.

Priming:

No priming required, apply directly onto surfaces to be skimmed.

Mixing:

Mix 4.5Lts clean water with 20Kg of MULTI FEATHER SKIM well in a bucket using a mechanical mixer. Ensure all lumps have been broken up.

Application:

Using a steel trowel, skim over the surfaces evenly. Allow to harden and then polish smooth using the wetted surface of the steel trowel face. Allow to dry for 8 hours before overcoating. If needed, sand with 100-120 grit sandpaper to remove high points and polish to a hard, dust free surface prior to overlay installation.

Equipment Care

All tools should be cleaned with water immediately after use. If delayed, equipment will need mechanical action to clean or be discarded.

Packing

Supplied in 20KG bags.

Quality Assurance

Multi Construction Chemicals South Africa (PTY) Ltd production and testing programs comply with all local and international testing standards.

REVISION: 3.1

MWMFS020
10 Items

Data sheet

COLOUR
Various
YIELD
N/A
PACK SIZE
20kg