Fine Feather Skimming Plaster
Fine Feather Skimming Plaster
MULTI FEATHER SKIM is a fine finishing and feathering plaster for use on dry walls, ceiling boards, concrete soffits, and pre-cast blocks. Skim-on application that leaves a smooth, plastered surface.
Typical Applications
MULTI FEATHER SKIM provides a hard-wearing non-dusting plastered surface over the following interior substrates:
- Dry walls
- Masonry
- Ceiling boards
- Soffits
- Concrete blocks
Download our Spec Sheets below:
Description
MULTI FEATHER SKIM is a fine finishing and feathering plaster for use on dry walls, ceiling boards, concrete soffits, and pre-cast blocks. Skim-on application that leaves a smooth, plastered surface.
Typical Applications
MULTI FEATHER SKIM provides a hard-wearing non-dusting plastered surface over the following interior substrates:
- Dry walls
- Masonry
- Ceiling boards
- Soffits
- Concrete blocks
Advantages
- Dust free surface
- Smooth application
- Fast setting
- Light weight
- Low VOC
- No need for bonding liquids
Typical Properties
Colour on setting |
Off Grey |
Drying Time |
20 minutes |
Time to sanding |
60 minutes |
Application Thickness |
6mm to feather |
Initial Setting Time |
10 min |
Working Time |
10-15 min |
Compressive Strength |
15 MPa |
Water Requirement |
4.5Lts per 20Kg |
Yield on 20Kg |
15 Litres |
Watch Points
- Do not re-constitute the mix after initial setting has occurred.
- Colour of the screed surface on setting may not uniform in appearance
- Do not apply over damp surfaces or where moisture is a concern.
Directions for Use
Surface Preparation:
Surfaces are to be clean, sound and free of dust and deleterious substances.
Priming:
No priming required, apply directly onto surfaces to be skimmed.
Mixing:
Mix 4.5Lts clean water with 20Kg of MULTI FEATHER SKIM well in a bucket using a mechanical mixer. Ensure all lumps have been broken up.
Application:
Using a steel trowel, skim over the surfaces evenly. Allow to harden and then polish smooth using the wetted surface of the steel trowel face. Allow to dry for 8 hours before overcoating. If needed, sand with 100-120 grit sandpaper to remove high points and polish to a hard, dust free surface prior to overlay installation.
Equipment Care
All tools should be cleaned with water immediately after use. If delayed, equipment will need mechanical action to clean or be discarded.
Packing
Supplied in 20KG bags.
Quality Assurance
Multi Construction Chemicals South Africa (PTY) Ltd production and testing programs comply with all local and international testing standards.
REVISION: 3.1
Data sheet
- COLOUR
- Various
- YIELD
- N/A
- PACK SIZE
- 20kg